A built sample on a table does not say how the unit will sit in the carton. If the order only names the code, the partner factory packs the way that code usually travels, which may not be the way your warehouse or your dealer expects to receive it. This note is the ship state you write: assembled, partly assembled, or knocked down.
OKTOP FITNESS, legally Oktop (Nantong) Sports Technology Co., Ltd., is a trading company in Nantong. We pass the state you write to the partner factory named for that code. We do not build the equipment, and we do not operate a factory or a production line. We do not choose the state for you, and we do not set a freight result on this page. Quantity, carton size and timing depend on the product. Ask us for a quote once the state is written, because the pack depends on it.
Name one state per code
Write one of these on the code sheet and on the order.
- Assembled. The unit leaves in the form a user will see, except for a part you name as removed so it can fit the carton. Name that part, or write that nothing is removed.
- Partly assembled. List the subassemblies that are already joined, and the parts that stay loose. A phrase such as "mostly built" is not a list.
- Knocked down. The main parts travel separate. A hardware bag, if there is one, is part of this state. List what the bag must contain.
Two codes can use different states. One code with two destinations can use different states only when each destination is its own row, as the two-destination note describes.
Say what the sample must show
The golden sample can be the built unit you will compare the product with. If the goods will ship knocked down, that built unit does not show the pack. Ask for the ship state in the packing sample, or write that a built sample and a knocked-down pack are two approvals.
A showroom unit is not the ship state. A unit that was assembled for a photograph does not change the order.
The manual has to match the state. An assembly manual for a unit that ships assembled will not match a carton the dealer must build, and the reverse is also true. Say which manual version goes in the carton. The manual is not the ship state.
Write the hardware as its own line
If fasteners, caps, a wrench or a small part travel in a bag, list the bag on the order. A bag that is not listed will not be treated as missing, because nobody asked for it. A bag that is listed and absent is a difference against the order.
The bag is not the spare-parts plan. Spares are parts you order for later support. The bag is what this unit needs for the state you wrote. Keep them on separate lines of the quotation and the packing list.
The outer carton should let the warehouse see the code and the quantity without opening the box. It does not have to name every fastener. The contents list does that, and it should travel with the packing list.
Point the check at the state you wrote
If you asked for a first-piece check, say whether the piece is judged built, partly built, or knocked down. A built piece does not close a knocked-down pack.
If you asked for a pre-shipment check, say whether the checker opens cartons to confirm the state and the bag. The count of cartons does not show that the bag is inside. Name how many units you want opened. This page does not choose that count.
A change from assembled to knocked down, or the other way, after the sample is signed, is a specification change. The old sample does not cover the new state. The purchase order should already show the state.
How to write the ship state
- Write assembled, partly assembled, or knocked down on the code and on the order.
- List any part removed for the carton, or the hardware bag, on its own line.
- Say whether the signed product sample also shows that state.
- Match the manual version to the state the dealer will open.
- Point a first-piece or pre-shipment check at that state when you asked for the check.
Questions brand owners ask about ship state
Does a built sample mean the goods will ship assembled?
No. The built sample is the product reference unless you also write the ship state. If the order does not name a state, do not treat the sample table as the carton. Write the state before the cartons are sized.
Is the hardware bag the same as a spare-parts order?
No. The bag is the parts this unit needs for the state you wrote. Spare parts are a separate line for support after sale. A missing bag is a gap in this order. A spare you did not order is not that bag.
Will OKTOP choose the state that is easier to ship?
No. You write the state your warehouse and your dealer can receive. We do not set a carton count, a weight or a freight result on this page. Ask us for a quote once the state is written. Until the quotation shows that state, it is still a request.
When the ship state is part of the brief, send the code and the state you want. The OEM / ODM path is where that line is quoted, customization is the carton around it, and common questions are on the FAQ.
