A check before loading can find a miss: a mark on the wrong face, a carton panel in the wrong language, a count that does not match the list. What happens next should be a document. A photo in a chat is not a decision. This note is the record a brand owner writes before the cartons close, and the three outcomes that record can carry.
OKTOP FITNESS, legally Oktop (Nantong) Sports Technology Co., Ltd., is a trading company in Nantong. We take the record to the partner factory that supplied the code. We do not build the equipment, and we do not operate a factory or a production line. We do not choose the outcome for you. The person you named writes it, or the code stays held. This page does not set a cost for rework or a date. Ask us for a quote when a next step has a price.
Separate a miss from a change you asked for
A miss is a difference from the release you already signed. A change is a new request. They are not the same paper.
If you now want a different logo, a different color or a different carton, that is a specification change, even if the wish came up during the check. Use the change note. Do not file a wanted change as a defect.
If the goods do not match the signed reference, the artwork version or the pack on the release, write a miss. The pre-shipment check is where you said what would be compared. The golden sample is the unit that comparison uses, when a copy was at the check. If no copy was there, the record names the signed paper used instead.
Write one record before the code is loaded
Keep one dated record for the codes affected:
- The order reference and the code.
- The revision and the reference the goods were compared with.
- What the release shows, and what the goods show instead.
- How many units or cartons were seen, and how many show the miss, when that count is known. If it is not known, write that.
- Whether the miss is on the product, on the paper inside the carton, or only on the outer carton.
- Photos, if you asked for them, that show the reference and the goods.
Send one message. OKTOP takes it to the partner factory for that code. A spoken acceptance from someone not named to sign does not close it. If two destination versions exist, name which one, using the rows in the two-destination note. Do not swap the cartons.
Choose hold, rework, or a concession
The person who may sign writes one outcome.
- Hold. That code does not load. Say whether other codes may leave. A hold removes the code from the order only if you write that.
- Rework. Name what is redone and what stays. Check the unit again against the same release. A rework the release never described is a specification change, not a repair.
- Concession. Accept the difference for named units or carton sequences only. It is not the standard for the next order.
If the outcome is still open when the goods are ready for the forwarder, the affected code waits. A booking does not close an open record.
Held units stay off the packing list that travels. Update the list and the invoice to the goods that load, and keep the carton identity matched to that list.
Keep the concession off the next reference
A concession covers only the units named. It does not replace the golden sample or the specification sheet. File it as an exception on this order.
To make that version the standard later, raise a specification change and sign a new reference where the part changed. Until then, a repeat order follows the original release. Tell the desk it applied once.
If the same difference is still there on arrival, that later paper is a quality claim. Point it back here. A claim does not reopen a signed concession. Fewer cartons do not change who books. The Incoterms note still names that party. The sample-to-shipment note remains the path the order was meant to follow.
A short miss-record checklist
- The difference written against the release, not against a new wish.
- One dated record. Unknown counts left unknown.
- One outcome: hold, rework, or a concession for a named quantity.
- The person who may sign, named before the day.
- Packing list and invoice updated to the goods that load.
- The concession filed as an exception, not as the next standard.
Questions brand owners ask about a miss found before loading
Does a concession approve the next order?
No. It accepts a named quantity on this order. The next order follows the signed release and the golden sample. To make the conceded version the standard, raise a specification change and sign the new reference before the next release.
Can other codes load while one code is held?
Yes, when the record says so. If the record is silent, the held code waits, and the rest of the order is still an open question. Update the packing list to whatever leaves.
Is this the same paper as a quality claim after arrival?
No. This record is written before loading, and it can still change what ships. A quality claim is written after arrival, against what the warehouse received. When both exist for one code, point from the claim back to this record.
To close a miss on a current order, send the record and the outcome you want written down. The OEM / ODM path shows where the check sits before export, customization is where the mark and the pack were set, and common questions are on the FAQ.
