A first email can name the brand, the market and a list of codes. It still leaves the partner factory to guess which points stay as the catalog builds them, and which points the brand wants changed. That guess is how a sample comes back against the wrong memory. This note is the page that replaces the guess: one sheet per code, written before anyone cuts a sample.
OKTOP FITNESS, legally Oktop (Nantong) Sports Technology Co., Ltd., is a trading company in Nantong. We do not build the equipment, and we do not operate a factory or a production line. The sheet is not a quotation. Quantity and timing depend on the product and the customization. Ask us for a quote.
Start from the code, then mark only the changes
Name the code at the top. If you do not have one yet, name the category and ask for a representative item before the sheet is treated as final. The briefing note is the first message.
Split the page into two plain columns.
- Baseline: the points that stay as the catalog code. Frame, geometry, hardware and the material the catalog already uses belong here, unless you are asking to change them.
- Request: the points the brand wants different. Mark position, color, pack and any change to a part each get their own line.
Label the row OEM when only the surface, the mark or the pack changes. Label it ODM when a dimension, a compound, a pad shape or a new tool is in the request. An ODM line is not approved because a nearby OEM code shared the file. The two kinds of row stay separate on the OEM / ODM path.
Write requests the partner can answer
Write the point, and leave a column the partner factory can fill. A phrase such as "make it look like our brand" cannot be sampled.
For the mark, write where it must be visible when the product is in use, and attach the artwork version. Do not name a printing process. The marking note is how the method is chosen, and the customization page is the same decision in short form. The partner's confirmed method is written back onto the sheet.
For color, name the reference you will approve against, and the parts that must match when they sit together. A screen swatch is not that reference. For pack, name an export carton, a dealer carton or a retail carton, and say whether a dieline exists. If it does not, write that it is not yet supplied.
For a product change, describe what must change and what must stay. A drawing is an attachment with its own version, not a replacement for the sheet. If a new tool is required, say who pays and who else may use it. That line is the subject of the tooling note.
Keep the open points visible
Leave a point open until the code closes it: the method of the mark, a color not yet seen on the substrate, a dieline not yet signed, a dimension not yet written so the partner can check it, or a document an importer named that may not exist for this code.
The partner factory answers the point, or says it cannot be done on that code, before a sample is cut. A document that does not exist is left off. The desk will not invent plant area, headcount or a certificate to close the line.
Give the file a revision and one signer
Put the code, a short revision and the date on the page and in the file name. When a line moves, raise the revision and say which line moved. Name the one person who may sign the sheet and, later, the sample. Comments that never reach the sheet do not travel.
Store the signed revision with the artwork and the dieline it cites. The sample that comes back should name that revision. If it names an older one, ask which file was used. A sheet signed for sampling is not a bulk release. Bulk follows the signed sample, as the sample-to-shipment note describes. A later line change uses the specification change note.
The sheet is not the quotation. Price and timing stay on the offer, as the quotation note describes. After the part is signed, the golden sample is what production is compared with. A repeat order names the revision it follows.
A short specification checklist
- One code per sheet, labeled OEM or ODM.
- A baseline column and a request column, with no unlabeled change.
- Artwork version, color reference and pack type, or a written note that they are not yet supplied.
- Open points left open until the partner factory answers them.
- A revision, a date and one person allowed to sign.
- The same revision cited on the sample that comes back.
Questions brand owners ask about a specification sheet
Is the specification sheet the same as the first brief?
No. The brief starts the conversation: brand, market, codes and whether each line is OEM or ODM. The sheet is the per-code page that says what stays as the catalog and what must change, before a sample is cut.
Can one sheet cover a whole category?
Not usefully. A category forces a representative item, and that item may not be the one you reorder. Write one sheet per code once the code is chosen.
Does a signed sheet approve the sample?
No. The sheet tells the partner factory what to sample. Approval happens on the part, against that revision. A later edit is a new revision, and it does not rewrite a sample that was already signed.
To open a sheet on codes you already have, send the list and the points you want changed. The OEM / ODM path shows where the sheet sits before the sample, customization is where mark, color and pack are decided, and common questions are on the FAQ.
