A signed sample is the reference the partner factory follows. A later change of artwork, color, material or pack is a new approval, not a note on the carton. This page is how a brand owner should raise that change, what it affects, and what stays frozen until the new approval is signed.

OKTOP FITNESS, legally Oktop (Nantong) Sports Technology Co., Ltd., is a trading company in Nantong. We work with a network of partner factories. We do not build the equipment ourselves. The customization page is where the original decisions were made. The sample-to-shipment note is the handoff this change interrupts.

Say what changed, and what must stay

Write the change as a line item, against the code, not as a comment in a thread. Each changed line should state the code and whether it is OEM or ODM; what was approved on the signed sample; what must now change (the mark, the color, the material, the carton structure, the language panel, or something else); what must stay exactly as approved; whether the change applies to goods not yet released, to a repeat order, or to both; and who on the brand side may sign the new approval.

If the change is only a typo on a carton panel, say that. If it is a new compound, a new pad, or a new geometry, it may move an OEM line into ODM work. That is a scope change, not a wording change. The matching note is where a partner factory is confirmed for work the original match did not cover.

When a new sample is needed

A sample is available on request. A new sample is the right path when the change will be judged on the part: a different color, a different mark size or position, a different material, or a carton with a new structure. A screen mock-up is not a color on the part, and a revised logo file is not an approved mark until it has been seen on the goods, or on a signed packing sample, according to what actually changed.

A change that is only a quantity, a destination, or a freight term does not by itself require a new product sample. It does require the quotation to be read again, because those items were part of the offer.

If the order has already been released, the change has to be accepted as a new instruction, with a clear statement of which units it applies to. Units already made to the signed sample should be dealt with as a separate decision: ship as approved, hold, or rework if rework is even possible on that part.

What a change does to price, timing and documents

Quantity and timing depend on the product and the customization. A change after approval can affect both, and it can affect tool use and carton printing. Ask us for a quote against the revised line. Do not keep the old total and add a sentence about the new logo.

If a new tool, plate or die is required, record who pays for it and who else may use it, before the new tool is made. If a named importer document was confirmed for the old specification, ask whether it still applies to the changed code, or whether it has to be confirmed again. OKTOP will not invent a document or carry an old confirmation across a specification it no longer describes.

If the goods were due to be consolidated with other codes, say whether the changed line must still arrive with them. An unsigned change should not hold a container of unchanged, already approved lines unless you deliberately choose that delay.

Keep the old approval frozen until the new one is signed

Until the new sample, or the new packing approval, is signed, the partner factory should follow the last signed reference for any units you still want under the old specification. If you want all work to pause, say so in the same note that describes the change. A pause is an instruction. Silence is not.

One person on the brand side should be allowed to sign. A later message from a different mailbox, with a slightly different file, should not quietly replace the approval. Name the file and the date.

The OEM / ODM path already states this rule at the order-release step: a later change of artwork, color or material is a new approval, not a note on the carton. Send the change list through the enquiry form. Company facts for the trading desk are on the about page. Category research written for gym buyers stays on oktopsports.com.

A short change list you can keep

Before you treat a specification change as issued:

  1. The change is written per code, with what stays and what must change.
  2. You have said which units it applies to, including any already released.
  3. A new sample is requested where the part or the pack must be judged again.
  4. Tool ownership is written down if a new tool is required.
  5. A revised quotation has been requested.
  6. The person who can sign the new approval is named.

Keep the change list here, with the codes and versions you actually want followed.

Questions brand owners ask about a change after sample approval

Does a signed sample still apply after we change the artwork?

It applies to the specification it was signed for. A change of artwork, color, material or pack needs its own approval. Until that approval is signed, do not treat the old sample as cover for the new version.

Can we change the carton text without a new product sample?

Sometimes the pack can be approved on a printed proof or a packing sample, if the product itself is unchanged. The product sample still remains the reference for the part. Ask which approval is needed for the change you actually want.

Will a change after release apply to goods already made?

Only if you and the desk agree that those units are in scope, and only if the part can take the change. Units made to the signed sample are a separate decision from units not yet released.