A signed sample and a release tell the partner factory what to make. They do not tell anyone what to look at before the cartons close. If the instruction is only the word "inspect", each person looks at a different thing. This note is the instruction a brand owner writes so the check has a scope, a reference and a written result.

OKTOP FITNESS, legally Oktop (Nantong) Sports Technology Co., Ltd., is a trading company in Nantong. We arrange the check you asked for, on your behalf, with the partner factories on the order. We do not build the equipment, and we do not operate a factory or a production line. The check compares the goods with the release. It is not a certificate. This page does not set a sampling number, a pass score or a date. Quantity and timing depend on the product and the customization. Ask us for a quote.

Name the order the check belongs to

Start with the order, not with a general list. A check written for "the next shipment" can be applied to the wrong revision.

  • The order or shipment reference.
  • The codes in scope, and any code that is out of scope.
  • The specification revision and the artwork version each code should match.
  • The sealed reference the checker will use, and where it is. The golden sample note is that unit. If it will not be there, name the signed record instead.
  • Who receives the written result, and who on the brand side may answer a question the same day.

The sample-to-shipment note is the handoff. This page is the scope only. Leave buyer-guide feature lists off this instruction.

Separate what is compared from what is only counted

Points compared with the signed reference and the release:

  • The mark: position, version and the method already confirmed for that surface. The marking note is where that method was chosen, and the customization page is the short form.
  • Color and finish, on the parts the sheet said must match.
  • The pack that was signed: carton type, dieline version, and the manual or label version if one ships inside.
  • The outer-carton fields, if you wrote them. The carton identity note is that list. Ask the checker to read the fields, not only the logo.

Points that are counted and recorded, and are not a new approval of the product:

  • Units and cartons against the packing list for the codes in scope.
  • Codes present that were not on the release, and codes on the release that are missing.
  • Cartons the checker could not open, and why.

A point off the release is not a fail. If one code has two destination versions, name both. The two-destination note is those rows.

Name the three outcomes before the day

  • Matches the release. The code may be loaded when the other papers on the order are ready.
  • Does not match, and loading of that code waits. Say whether the rest of the order may still close.
  • Does not match, and you will decide in writing: hold, rework, or a concession for a named quantity. The miss note is that decision. A spoken "ship it" is not an outcome.

Name who may accept a miss. A comment is not an acceptance. If nobody is named, the code stays held. If you appoint an inspection company, write who gives it the reference and who pays. OKTOP will not invent a pass standard on the day.

File a result, not a folder of photos

Ask for one record: order, codes, revision, what matched, what did not, and units seen where the count is known. Say when a count is unknown. Photos only if you asked for them, showing the reference beside the goods. End with the outcome, or a note that it is open, plus the date and the writer.

File it with the release before the cartons close. A later quality claim is a separate step, after arrival. A quiet check does not mean every unit was opened. The trade term stays on the order, as the Incoterms note describes.

A short pre-shipment-check checklist

  • Order, codes in scope, and the revision each code should match.
  • The reference the checker will use, or a written note that it will not be there.
  • Compared points kept separate from counted points.
  • Three outcomes named, and the person who may accept a miss.
  • A written result filed with the release before the cartons close.
  • A line that says the check is not a certificate.

Questions brand owners ask about a pre-shipment check

Is a pre-shipment check the same as a product certificate?

No. The check compares the goods in scope with the release and the reference you named. It reports what was seen. It does not certify the product, the plant or the shipment. OKTOP will not attach a mark this desk does not hold.

Should the check cover every unit?

Only if the instruction says so. This page does not set a share of the order or a sampling plan. If you wrote no scope, ask what will be opened and put that answer on the instruction before you treat the result as complete.

Can the same instruction be reused on the next order?

Yes, when the next order names the same revisions and the same reference. A new mark, a new pack or a new destination version needs those points updated. A previous result does not approve the next shipment.

To put a check on the current order, send the codes, the revision and the outcomes you want written down. The OEM / ODM path is where inspection sits before export, customization is where the mark and the pack were chosen, and common questions are on the FAQ.