Several people can write to a sourcing desk in the same week. If each message is treated as an approval, the partner factory has three instructions. This note is the list a brand owner writes first: which decisions exist, and who may close each one.
OKTOP FITNESS, legally Oktop (Nantong) Sports Technology Co., Ltd., is a trading company in Nantong. We do not build the equipment, and we do not operate a factory or a production line. We do not choose between two people at your company. We follow the name on the list, or we wait. This page does not set a price or a date. Ask us for a quote when a decision changes the order.
Separate the decisions before you name the people
A sample, a change, a substitution and a concession are different papers. Write one register before the first sample. For each decision you use, name the person and, if you want one, the backup. A blank name lets the last email become the approver.
- The code specification sheet, before a sample is cut. This person accepts the written points, not a part that does not exist yet.
- The sample, including mark, color and pack. The golden-sample note is the unit that signature points to. A comment on a photograph is not this line.
- A specification change after that signature. Say if a different person holds this line. The old sample stays the reference until the new approval exists.
- A substitution the partner factory asks for. This person writes accept, refuse, or wait.
- A miss found before loading: hold, rework, or a concession for a named quantity. The concession stays on this order.
- The purchase order. This person accepts the quoted rows and does not hide a new specification in the order.
A job title, or an empty line, is not a name.
Say what a message from someone else means
A designer, a salesperson or a planner may still write. That message is a comment unless the register names the sender as the approver. Comments go to the named person, and only that person's written outcome is an instruction. OKTOP will pass a comment on when you ask. We will not treat it as a release, a change or a concession.
If two named people disagree, the code waits. Name who settles it, or write that you will send one outcome. We will not average the messages, and we will not ask the partner factory to pick. A shared inbox is not a person. Name the individuals who may send from it.
The same person answers an order acknowledgment that does not match, and the outcome of a first-piece check. A changed quantity, or a decision to continue the bulk, still needs that name.
Limit the backup, and date the list
A backup signs only while the first person is away, and only for the decisions you listed. It is not a second opinion on a day the first person is working. If there is no backup, write "no backup". A blank will be read as anyone on the thread.
Date the list and name the programs it covers. It does not follow those people onto a later repeat order after the names have changed. When someone leaves, replace the name before the next sample. The list says who may approve. It does not itself approve the part, the sheet or the order.
Copy the name onto the later papers
Copy the register onto the sheet, the sample record, the change, the substitution answer, the miss record and the purchase order. If a paper shows another name, correct it before the code moves. The pre-shipment check should use that same name when a question needs an answer the same day.
A showroom unit does not add an approver. A preference from the floor still goes to the person named for changes. OKTOP files the register you send and does not add a name. If the list is missing when a decision is needed, the code stays unreleased. A phone call is a reason to update the list, not a replacement for it.
A short approval-register checklist
- Each decision you use has one named person.
- A sample, a change, a substitution, a concession and the purchase order are separate lines when different people hold them.
- Messages from anyone else are comments, not instructions.
- A disagreement between named people leaves the code waiting.
- A backup is limited, or marked "no backup".
- The list is dated, and it is replaced when the person changes.
- The name on each later paper matches the list.
Questions brand owners ask about who may approve
Can several departments approve the same sample?
Only if the register says how. One signature means one named person, with everyone else commenting to that person. Two signatures means both names are written, and both are required. A thread of comments is not a shared approval.
What if the person who may sign is away?
Use the backup already named, for the decisions already listed. If the list says "no backup", the decision waits. Update the list when the absence will cover the next sample. Do not ask the desk to accept a colleague for one day.
Will OKTOP decide which of our emails to follow?
No. We follow the name on the register. If two named people disagree, or the name is missing, we wait. We do not pick a side, and we do not ask the partner factory to pick.
To send the register with a current program, write the names against the decisions you use. The OEM / ODM path is where those decisions sit, customization is the mark, color and pack the named person approves, and common questions are on the FAQ.
