A quotation prices a list. A purchase order is the paper that accepts that list. When the two do not say the same thing, the partner factory has two instructions and no way to know which one you meant. This note is how a brand owner writes the purchase order so it repeats the quotation, and what to do when a row does not match.
OKTOP FITNESS, legally Oktop (Nantong) Sports Technology Co., Ltd., is a trading company in Nantong. We take the purchase order to the partner factory named for each code. We do not build the equipment, and we do not operate a factory or a production line. This page does not set a price, a deposit or a date. Ask us for a quote when a row still needs a number.
Treat the purchase order as the acceptance, not as a new brief
The quotation note is how to read the offer. This note starts after you have decided to accept it. The purchase order should name that quotation: its date, its reference, and the revision you are accepting.
A purchase order is not the place to introduce a new logo, a new color or a new carton. Those belong on the code specification sheet and, once a part exists, on the signed approval. If you want a change at the moment of ordering, raise it as a specification change and wait for a revised quotation. Do not hide the change inside a quantity column.
The sample-to-shipment note is the path the order then follows. The purchase order does not replace the signed sample. It names the revision and the quantity.
Put one row on the order for each row you are accepting
Keep the same code, the same description and the same revision the quotation used. Add:
- The quotation reference and its date.
- The code, and the destination or pack version if the quotation split them.
- The quantity, in the same unit the quotation used.
- The mark, the color and the pack, by the revision already signed, or "as quoted" when the quotation names that revision.
- The freight term on that row. The Incoterms note is where it was agreed. Do not write a different term here and leave the quotation unchanged.
- The specification-sheet revision, the artwork version when a mark is in scope, and the signed sample's identification. If no sample is signed, write that.
- The person who may sign, and the date.
If a row is not being bought, say it is not accepted. Silence is not a refusal. A repeat order needs its own purchase order. The first one does not renew itself.
Your internal item number may sit beside the code. It does not replace it. A named spreadsheet is part of the order when the email says so. An unnamed attachment is not a row.
Do not let the form rewrite a row
A purchase order must not, by itself, change the quantity, the mark, the color, the manual or the carton. It must not add a second destination beside a code priced for one market. Use the two-destination note and ask for both rows on the quotation first. It must not add a port or a document the quotation did not list. If the form prints a price, it must be the quotation price. If it does not match, stop.
Payment follows the quotation you are accepting. This page does not set a deposit, a balance or a currency. Copy the quotation's payment line, or leave the box blank and point at the quotation. A signature from someone who was not named does not close the comparison.
Stop when a row does not match
Send one comparison before release: both references and dates, the rows that match, the rows that differ, the quotation rows left out, and any purchase-order row the quotation does not have.
OKTOP takes that comparison to the partner factory for those codes. We do not choose which paper wins. The person you named corrects one of them until the rows agree. Until then the code stays unreleased. A booking does not close an open mismatch. A new wish, rather than a typing error, is a specification change. The old signed sample stays the reference until a new approval exists.
A short purchase-order checklist
- The quotation reference, date and revision are on the purchase order.
- Each accepted row repeats the code, quantity, revision and freight term.
- Rows you are not buying are named as not accepted.
- No new mark, color, pack, destination or price appears only on the purchase order.
- Payment language copies the quotation or points at it.
- The person who may sign is named.
- A mismatch is written down, and the code stays unreleased until the rows agree.
Questions brand owners ask about a purchase order
Does the purchase order replace the quotation?
No. The quotation is the offer. The purchase order accepts the rows it repeats. Where they disagree, neither paper is the release until you correct one of them and the rows match.
Can we change the quantity on the purchase order?
Only after the quotation shows the new quantity as well. A different quantity can change the price, the pack and the freight. Do not assume the old row still applies.
Is a signed sample enough to start without a purchase order?
No. The sample shows the revision. The purchase order shows the quantity you accept. Keep both. A sample alone is not a release.
To release a current list, send the quotation reference and the purchase order together. The OEM / ODM path shows where the order sits after the sample, customization is where the mark and the pack were set, and common questions are on the FAQ.