A purchase order accepts a quotation. An acknowledgment is the paper that comes back and says those rows were received as written, or says they were not. If you file the reply without reading it, a changed quantity, a changed pack or a changed freight term can become the instruction. This note is the comparison, and what to do when a row does not match.

OKTOP FITNESS, legally Oktop (Nantong) Sports Technology Co., Ltd., is a trading company in Nantong. We take the purchase order to the partner factory named for each code. We do not build the equipment, and we do not operate a factory or a production line. We do not treat a small difference as settled. This page does not set a price or a date. Ask us for a quote when a row still needs a number.

Know which paper you are reading

The purchase-order note is how you accept the quotation. This note starts when a reply arrives. It may be a form, a signed copy, or a message that repeats the rows. It is not a release until you mark the rows as matching.

The reply has to name your purchase-order reference and date. A note that says only "the order we discussed" has not acknowledged the rows. Send it back. A quotation that is still open is not closed by a short email. If no purchase order exists yet, you are still on the offer. A proforma that changes a row is not an acknowledgment of the old one.

Compare the rows, not only the total

Read each code against the purchase order.

  • The code, and the destination or pack version if the order split them. The two-destination note is those rows. Merging the two lines does not accept the split.
  • The quantity, in the same unit. A matching total can hide a swap between codes, so read the lines.
  • The sheet revision, the artwork version and the signed sample's identification. If the order said no sample was signed, the reply should not invent one.
  • The mark, the color and the pack, by the named revision. Customization is where those were set. "Branded as usual" is not a revision.
  • The freight term agreed in the Incoterms note. A different term is a different row.
  • A code on your order that the reply omits, and a code on the reply that you did not order.

"All as discussed" does not finish the comparison. A point the reply leaves silent stays silent. Do not treat silence as acceptance. An internal item number on the reply does not replace the sourcing code on the specification sheet.

Three results, and only one of them releases the row

The person on the approval register writes one result per row. Anyone else may point at a difference. They cannot close it.

  • Matches. The row can move toward the release in the sample-to-shipment note. The signed sample stays the product reference. The acknowledgment does not replace it.
  • Does not match. The row stays unreleased until the purchase order or a new acknowledgment makes the rows agree. Artwork, color, material or pack belongs on a specification change, not as a quiet edit. A different quantity can change the price, the pack and the freight. Ask us for a quote.
  • Silent. The row is unmatched until the reply states the missing freight term, revision or pack.

Matching rows continue only if you say so. Saying nothing leaves the rest of the order open with the unmatched row. A partial shipment loads codes already released. It does not skip a mismatch. OKTOP will not rewrite either paper. You choose which one changes.

Keep the reply with the order it answers

File the acknowledgment on the purchase-order reference. A repeat order needs its own order and its own reply. The first acknowledgment does not cover the next quantity.

An open substitution is not accepted by the reply. Leave that code unmatched until the outcome is written. Goods that are neither the order nor the reply belong on a quality claim, pointed back at both papers.

A booking does not close a mismatch. The pre-shipment check needs one release. If the papers still disagree, that release is not there. A first-piece check, when you asked for one, uses the same agreed release.

A short acknowledgment checklist

  • The reply names your purchase order.
  • Each code, quantity, revision, mark, pack and freight term is compared, not only the total.
  • A silent point stays unmatched.
  • One result per row: matches, does not match, or silent.
  • An unmatched row is corrected on one of the two papers before release.
  • A later order gets its own reply.
  • The signed sample remains the product reference.

Questions brand owners ask about an order acknowledgment

Does an acknowledgment replace the purchase order?

No. The purchase order accepts the quotation. The acknowledgment says the reply matches that acceptance, or it does not. Where they disagree, neither paper is the release until the rows agree.

What if the acknowledgment changes only the quantity?

The row does not match. A different quantity can change the price, the pack and the freight. Revise the quotation and the purchase order together, or ask for a reply that returns to the quantity you ordered.

Can production start from a confirmation message alone?

Only when the message states the rows and you have marked them as matching. "Confirmed" without the codes and the revisions is not that mark. The signed sample and the purchase order are still required.

To compare a reply with an order already sent, send both papers. The OEM / ODM path is where the purchase order sits before release, customization is the mark and pack the reply must repeat, and common questions are on the FAQ.