A signed sample says what a released order should match. It does not say anyone will look at the first finished unit and decide whether the rest of that code continues. If the instruction is only "inspect", it gets mixed up with the later check, when the cartons are about to close. This note is the earlier one: what the first piece is compared with, and which outcome you write before the bulk continues.
OKTOP FITNESS, legally Oktop (Nantong) Sports Technology Co., Ltd., is a trading company in Nantong. We arrange the check you asked for, with the partner factory named for that code. We do not build the equipment, and we do not operate a factory or a production line. The check compares the unit with your release. It is not a certificate. This page does not set how many units to open, a score, or a date. Ask us for a quote when you add the check.
Say whether you want the check
A pilot order is a separate smaller order. A first-piece check sits inside an order already released, on the first finished units, before the rest of that code is finished. If the order does not ask for it, the bulk was not waiting.
The pre-shipment check comes when the cartons are ready to close. A match on the first piece does not close that later check, and the later check does not replace a first piece you never wrote.
The golden sample stays the reference unless you sign the first piece as a new one. The showroom note keeps a photo unit off the standard.
Write the scope on the order
- The order, the code and the revision. Two destination versions need the version named. The two-destination note is those rows. One version does not speak for the other.
- How many units are in the check. You write the count. This page does not choose it.
- Where the sealed reference will be. If it will not be beside the piece, name the signed record to use instead of an old photograph.
- The points to compare: mark and version, the color and finish on the code sheet, and the pack if this unit already has one. A point off the release is not a miss.
- Who receives the result and who may answer. Use the person already named for this decision.
The marking note is where the method was chosen. Customization is the short form. The purchase order and its acknowledgment should already agree. This check cannot choose between two papers.
Write continue, stop, or change
The named person writes one outcome. If no one is named, the code waits. OKTOP does not pick, and we will not call a difference close enough.
- Continue. The rest of this code may proceed against the same release. Other codes stay unreleased unless you name them.
- Stop. The rest of this code waits. Say whether finished units are inside the stop. The code leaves the order only if you write that it does.
- Change. Your request is a specification change. A difference the partner factory proposed is a substitution. The rest waits for the new approval. The partner factory follows the first piece only after you sign it as the new reference.
A spoken "carry on" is not the record. The record needs the outcome, the code and the revision. A difference found as the cartons close belongs on the miss note, not relabeled as this check.
Keep the result on this order
File it with the order and the revision. A repeat order does not inherit "continue". Write the check again, against that order's sample, if you want it next time.
The result is not a certificate or a test report. OKTOP will not attach a document this desk does not hold. If an adviser named a paper, ask whether it exists for this code. The first-piece record is not that paper.
A partial shipment chooses which released codes load. It does not decide whether the rest of this code is finished. The sample-to-shipment note is the longer path around this decision.
A short first-piece checklist
- The order asks for the check. Otherwise the check is not implied.
- The code, the revision and the unit count are written.
- The reference is the sealed sample, or the signed record you named.
- The purchase order and the acknowledgment already agree.
- One outcome: continue, stop, or change the release.
- A change waits for a new approval before the rest of the code continues.
- A pre-shipment check you also asked for stays a separate instruction.
Questions brand owners ask about a first-piece check
Is a first-piece check the same as a pre-shipment inspection?
No. The first-piece check decides whether the rest of that code continues, on the units you named before the bulk is finished. The pre-shipment check compares the goods with the release when the cartons are ready to close. One result does not close the other.
Does a matching first piece approve the whole quantity?
Only as far as the outcome you wrote. "Continue" lets the rest of that code proceed against the same release. It does not replace the signed sample, approve another code, or close a later check.
Will OKTOP issue a certificate from this check?
No. The record says what was compared and which outcome you signed. It is not a product certificate, a plant approval or a test report. OKTOP will not invent one.
When you want a first-piece check on a released code, send the order reference and the points to compare. The OEM / ODM path is where the check sits before shipment, customization is the mark and pack the piece is judged against, and common questions are on the FAQ.